RHOVAN. [email protected]

Intake

What we need to quote

Answer what you can. Gaps are normal on a first pass and we work them out on a call, but the more of this that arrives with your first message, the faster a real number comes back.

  1. 01

    Node count, and the date you need them running.

  2. 02

    Site address, dock access, and route to the room.

  3. 03

    Rack size and allowable floor loading.

  4. 04

    Power available per rack, and the feed type.

  5. 05

    Cooling method in the hall, and whether you run aisle containment.

  6. 06

    Liquid cooling available, and which type.

  7. 07

    Fabric choice, InfiniBand or Ethernet.

  8. 08

    Switch and IP configuration, yours or ours to set.

  9. 09

    Node to switch port mapping, if you have a preference.

  10. 10

    Naming and labeling standard, if you run one.

  11. 11

    Cross rack cabling rules, and anything else sharing the rack.

  12. 12

    Software image, and whether the cluster needs internet or CSP access.

Contact

Tell us your capacity requirement.

Pricing and lead times are issued on request. Send the list above, or as much of it as you have, and a written quote comes back from there.

[email protected]