We write the build sheet and hold the schedule. Our integration partner performs the physical build to it, so you get one contact for the whole job rather than a pallet of boxes and a phone number.

What we manage

Build sheet

Cooling method

Air or liquid, and the containment strategy your hall already runs.

Liquid cooling

Direct to chip, rear door heat exchanger, or immersion, matched to what the facility can feed.

Power and weight

PDU layout, cord routing, and rack loading confirmed before anything ships.

Network mapping

Node to switch port mapping, IP settings, and switch configuration set at build.

Cabling

Cross rack rules checked against your data center standard. Cable, PDU, and cord colors to your scheme.

Naming and labeling

Node names, switch names, and a labeling scheme agreed up front, not invented on site.

Adjacent equipment

KVM, UPS, ATS, and anything else sharing the rack, integrated in the same pass.

Software and commissioning

Imaged and validated before crating. Onsite install, startup, and preventive maintenance under SLA.

Procurement

How it runs

Requirement

Node count, fabric, power and cooling envelope, delivery site. The list below covers it.

Allocation

Units, lead time, and price confirmed in writing before you commit.

Integration

Build sheet signed off, then racked, cabled, imaged, and labeled to it. Freight and insurance run on our schedule.

Commissioning

Onsite install, startup, and validation before handover. Preventive maintenance under SLA if you want it.